On Wednesday we had the second construction site quality check made by the VPB. Again, not a single flaw was found. The commendation of the inspector goes to Mr. Haug, Mr. Lutz, our construction supervisor Mr. Müller as well as Attraktives Wohnen GmbH. After hearing how other construction sites look like, we are very happy that all tasks have been completed in an examplary and sterling manner.
Bautagebuch unseres Hausbau-Projektes mit Favorit Massivhaus - Attraktives Wohnen GmbH Reutlingen.
Sonntag, 19. Oktober 2014
Achte Bauwoche - Eighth week of construction works
On Wednesday we had the second construction site quality check made by the VPB. Again, not a single flaw was found. The commendation of the inspector goes to Mr. Haug, Mr. Lutz, our construction supervisor Mr. Müller as well as Attraktives Wohnen GmbH. After hearing how other construction sites look like, we are very happy that all tasks have been completed in an examplary and sterling manner.
Samstag, 11. Oktober 2014
Siebte Bauwoche/ Richtfest - Seventh week of construction works/ Topping-out Ceremony
Diese Woche wurden die
Garagenfundamente geschalt und gegossen, der Aushub verfüllt und die zuvor falsch
gesetzte Fensteröffnung im Erdgeschoss korrigiert. Anschliessend wurde das Dach aufgeschlagen. Dann war es endlich soweit - wir
konnten Richtfest feiern. Mit einem selbstgebauten Richtkranz und einem
gemütlichen Grillabend konnten wir diesen großen Meilenstein feiern. Wir möchten
uns an dieser Stelle ganz herzlich bei Herrn Lutz und seinen Männern der
Zimmerei Lutz für den rührenden
Richtspruch und natürlich auch für die ausgezeichnete Arbeit bedanken.
Ebenfalls gilt unser Dank der Firma Haug
aus Stammheim sowie der Firma Attraktives Wohnen GmbH und allen unseren Gästen, die diesen Abend für uns unvergesslich gemacht haben.
We had our
roof and the garage foundations built this week. Also the site has been further
refilled and the window opening in the first floor was corrected. Then finally it was
time for the Topping-out ceremony. We celebrated this big milestone with a self-built
topping-out wreath and a cosy BBQ. We would like to thank Mr. Lutz
and his men from 'Zimmerei Lutz' for the touching ceremony and of course for
the excellent job they did. We would also like to thank the construction
companies 'Haug' located in Stammheim and Attraktives Wohnen GmbH, as well as all our guests who made this an unforgettable evening.
Richtkranz Bastelanleitung - DIY Topping-out wreath instructions
1. Ein Hula Hoop Reifen bildet die Basis des Richtkranzes.
Kosten: 7,50 Euro im Spielwarenladen (gibts sicher auch viel günstiger)
A hula hoop is the basis - costs 7,50 Euro.
2. Benutzte Verpackungsfolie vom Baumarkt um den Reifen wickeln und mit Paketklebeband fixieren
Kosten: 0,00 Euro (einfach im Baumarkt nachfragen)
1,00 Euro für das Klebeband
Kosten: 0,00 Euro (einfach im Baumarkt nachfragen)
1,00 Euro für das Klebeband
Secure used packaging foil (from the nearest DIY market or any other shop) with parcel tape - costs 0,00 Euro (just ask the guys in the store), 1,00 Euro for the tape.
3. Alte EDEKA Tüten aufschneiden, über die Folie legen und mit Klebeband fixieren. Da die Tüten grün-braun sind überdecken sie die weisse Folie perfekt und schimmern später nicht durch.
Kosten: 0,00 Euro
Cut and wrap old bags form EDEKA (or any bag/foil preferrably green or brown so it does not shine through) around to cover the foil and secure with parcel tape - costs 0,00 Euro.
Kosten: 12,00 Euro (wird deutlich günstiger wenn man Heckenschnitt vom
Häckselplatz holt)
Put the thuja branches on the wreath and secure them with green florist's wire - costs 12,00 Euro (it would be a lot cheaper if you could get the branches from a gardener for free).
5. Bänder nach belieben und in den gewünschten Farben befestigen. 4 Bänder
dienen oben als Befestigung. Die anderen zur Dekoration unten am Kranz
verknoten und in beliebiger Länge flattern lassen.
Kosten: 15,00 Euro
(einfach bei EBAY bestellen - wir haben 25m Bänder genommen und es ist
viel übriggeblieben)
Place different color ribbons. 4 of them will be used to secure the wreath. The others are for decoration - costs 15,00 Euro (just order some on EBAY - we bought 25m ones and we have a lot left).
Place different color ribbons. 4 of them will be used to secure the wreath. The others are for decoration - costs 15,00 Euro (just order some on EBAY - we bought 25m ones and we have a lot left).
The wreath should be placed and secured on the roof by the carpenters (not the band).
Samstag, 4. Oktober 2014
Sechste Bauwoche - Sixth week of construction works
Samstag, 27. September 2014
Fünfte Bauwoche - Fifth week of construction works
Die tragenden Wände im Erdgeschoss sind fertiggestellt, die
OG-Bodenplatte wurde gegossen, das Gelände wurde weiter verfüllt, die Terrasse
angeschüttet und das Schnurgerüst für die Garage gestellt.
Mittlerweile haben wir auch die Sanitär-Bemusterung hinter uns. Mit knapp 2 Stunden waren wir hier recht schnell fertig. Jeder Extrawunsch ist ein tiefer Griff in den Geldbeutel.
Finally our
building starts to look like....a castle?!
The
load-bearing walls in the first floor have all been layed, the second floor
base plate has been poured, the site has been almost completely re-filled, the terrace
was raised and the batter boards for the garage were installed.
Meanwhile
we sampled the bathroom facilities. With less than 2 hours we were quite quick
here. Every special request is another hand dug deep in your pocket.
Samstag, 20. September 2014
Vierte Bauwoche - Fourth week of construction works
Am Mittwoch hatten wir dann den ersten Baustellenbesuch vom Verband Privater Bauherren (VPB). Der Gutachter, war sichtlich überrascht, wie sauber und ordentlich unsere Baustelle ist.
Nach seinem Rundgang bekamen wir dann hervorragendes Feedback:
Unsere Baustelle gehöre zu den Top 5%, die unser Gutachter gesehen habe. Es
gibt keinerlei Mängel und alle Arbeiten wurden hervorragend erledigt. So etwas
sehe man heutzutage sehr selten.
Das Lob möchten wir an dieser Stelle an Herrn Haug und seine
Männer vom Bauunternehmen Helmut Haug - Calw Stammheim weitergeben. Sie leisten
wirklich hervorragende Arbeit in exzellenter Qualität - und das bei jedem
Wetter!
A lot of
action this week.
At the
beginning of the week the basement ceiling was added and poured, the
electrician came to the construction site and prepared everything in the
basement, the exterior walls for the first floor were layed, most of the
working space around the basement was backfilled and the soon to be terrace was
heaped up. The roof drainage (from the baseplate to the cistern) was installed
and macadamed, the HCS was installed and reserve conduits were put in place for
the suppliers (Cable, Phone and Electricity). The conduits were also macadamed
after.
On
Wednesday we had the first quality check of the Verband Privater Bauherren
(VPB), a group of independant consultants and architects. The consultant was
surprised how clean and tidy our construction site was. After his review we
received his feedback, that our construction site is within the top 5% of the
sites he has seen yet. There are no flaws and the work was done in an excellent
quality. According to him this is rare these days.
We would like to share this amazing feedback with Mr. Haug and his team from the Helmut Haug Construction Company - Calw Stammheim. They are doing an outstanding job - in any wind and weather.
We would like to share this amazing feedback with Mr. Haug and his team from the Helmut Haug Construction Company - Calw Stammheim. They are doing an outstanding job - in any wind and weather.
Freitag, 12. September 2014
Dritte Bauwoche - Third week of construction works
Diese Woche gab es wieder einiges Neues zu sehen auf unserer Baustelle. Die zweite Kellerhälfte wurde fertig geschalt und gegossen, die Öffnung für den Mehrspartenanschluss wurde gelegt, die Isolierung und Dämmung wurde angebracht und die Innenwände wurden gemauert.
Die Kellerdecke kann kommen!
A lot of new things to see on our construction site this week. The second half of the concrete walls of the basement were poured, the HCS hole was drilled, the insulation was installed and the inner basement walls were layed.
Now the basement ceiling can come!
Freitag, 5. September 2014
Zweite Bauwoche - Second week of construction works
Eine sehr aufregende und produktive Woche liegt hinter uns. Zeit,
euch auf dem Laufenden z halten. Wir hatten einen Termin mit dem Elektriker, um
die Lage und Installationen der Steckdosen, Schalter und Deckenauslässe zu
besprechen. Ein guter Tipp - das ganze verläuft wesentlich schneller und
angenehmer wenn man sich vorab schon mit dem Thema Steckdosen, Lichtschalter, TV-
und EDV-Dosen, Leerrohre usw. auseinandersetzt und sich bereits ein paar
Gedanken gemacht hat. Wir haben vor dem Gespräch unsere Pläne ausgedruckt und schon
mal markiert wie wir uns das vorgestellt haben, deshalb hat das Gespräch nur 2
Stunden gedauert.
Am Mittwoch wurde dann auch schon die Keller-Bodenplatte
gegossen. Die Regenwasser-Zisterne (das ist das große schwarze Ding auf dem
Bild) wurde montiert und befüllt - das Teil wiegt nun rund 6 Tonnen. Am Freitag
hat das Wetter super mitgemacht und der halbe Keller wurde gegossen. Unser Haus
nimmt langsam Gestalt an.
A very
exciting and productive week is coming to an end. Time to update our blog. We
had an appointment with the electrian to discuss the installation of the power
sockets, switches, cabling, lamps, TV an
data sockets etc. A good hint: take your time to go through the plans and think
about this before making the appointment. It will save you a lot of time. We
printed the plans and marked the spots where we thought we would like to have
sockets/swtiches/etc.
Hence our
appointment with the electrician only took 2 hours.
On
Wednesday the basement foundation slab was built. The rain-retention-cistern
(the big black thing on the picture) was installed and filled - it now weighs
about 6tons.
Finally, on
Friday the weather was good and half of the basement concrete walls were poured.
Finally it
begins to look like a house.